Problem and output
Hedging uses an offsetting or related position to reduce a specific risk. The outputs are the hedge ratio, instrument, tenor, cost and residual basis risk. The aim is to lock an acceptable net exposure and reduce cash-flow volatility, not to remove all uncertainty or raise returns.
Inputs and data requirements
Inputs include the physical exposure, price or duration sensitivity, contract size, expiry, margin rate, financing rate, commissions and basis history; basis must be matched by product, location and quality. The example is hypothetical: buy 100 tonnes of coffee in three months at CNY 2,000 per tonne, with futures at the same price, a 10-tonne contract, 10% margin, 3% annual financing and a CNY 50 commission.
The hedge-versus-speculation distinction follows OpenStax: a hedge is a risk-management tool that reduces exposure, while speculation is a directional bet on the future [1].
Assumptions
Futures and spot prices are highly correlated; basis mean-reverts but is uncertain; the physical purchase quantity is not adjusted during the hedge; hedge accounting and taxes are ignored; margin can be met at any time. All numbers are teaching assumptions, not a trading recommendation.
Steps
- Exposure is
100×2,000 = CNY 200,000; contract notional is10×2,000 = CNY 20,000; contracts are200,000/20,000 = 10. - Buy 10 futures; margin is CNY 20,000; three-month financing is
20,000×3%×0.25 = CNY 150. - If both futures and spot rise to CNY 2,300: spot costs CNY 230,000, the futures gain is CNY 30,000, and net cost is CNY 200,000.
- If both fall to CNY 1,700: spot costs CNY 170,000, the futures loss is CNY 30,000, and net cost is still CNY 200,000.
- If futures rise to CNY 2,300 and basis is +CNY 50 per tonne (basis = spot price minus futures price here), spot cost is CNY 235,000; adding the CNY 50 commission and CNY 150 financing (CNY 200 in total), net cost is
235,000-30,000+200 = CNY 205,200, or CNY 2,052 per tonne. - With an option struck at CNY 2,000, a premium of 3% of notional is CNY 6,000 and the maximum effective price is about CNY 2,060 per tonne; the buyer keeps the benefit of a price fall and faces no margin calls.
- Record the hedge ratio, expiry and roll, and changes in basis.
The futures mechanics also follow OpenStax: the contract trades the asset in the future at a price locked in today, and the exchange requires margin and marks positions to market daily to reduce counterparty risk [2].
Figure
Interpreting the result
Futures lock the price near CNY 2,000 at the cost of giving up the benefit of a fall, plus margin, financing, commissions and basis. A hedge ratio of 1.0 hedges price risk only, not quantity, quality, counterparty or liquidity risk. A basis of +CNY 50 raises the effective purchase price to CNY 2,052: the lock is the futures price plus basis, not an absolute spot price. The hedge ratio should match exposure sensitivity rather than quantity mechanically; options keep the downside benefit but cost more. Compare the cost with the risk reduction achieved.
Failure conditions
- a wrong exposure or sensitivity estimate
- over-hedging or under-hedging
- basis widening without a buffer
- margin calls forcing liquidation
- roll costs and reduced liquidity
- missing the opportunity cost of capital tied up in margin
- counterparty default on an OTC contract [3]
- accounting and tax errors
- treating the hedge as a directional speculation
- hedging risk that diversification could remove
Verification
Compare hedged and unhedged profit and loss; backtest basis; run ±15% price scenarios; calculate hedge effectiveness; stress margin; check liquidity, roll spreads, and the match of expiry, currency and quality between instrument and exposure.
Reproduction
contracts = exposure/contract notional; net cost = spot cost - futures P&L + fees; effective price = net cost/quantity. Example: 10 = 200,000/20,000; 205,200/100 = 2,052.
Knowledge-point review
risk exposures
Definition: Risk exposures are sensitivities to market, rates, credit, FX, commodities, liquidity and factors.
Mechanism: They are measured by beta, duration, credit spreads, VaR and factor regressions; explicit and hidden exposures together drive losses.
Example: For example, a portfolio with beta 1.2 should fall about 12 percent when the market falls 10, plus sector and FX exposure.
Boundary: Exposure is not one number; nonlinearity, correlation and tails deviate losses, and models can miss hidden risk.
instrument selection
Definition: Risk-management instruments include cash, futures, options, swaps, ETFs and structured products for hedging, insurance or diversification.
Mechanism: Choice depends on risk type, horizon, liquidity, cost and basis; futures are linear, options convex and swaps customised.
Example: For example, index futures hedge market beta, options hedge tails and FX forwards hedge currency.
Boundary: More complex tools are not better; basis, counterparty, margin and terms cause hedge failure, and illiquid tools cannot be adjusted under stress.
hedge error
Definition: Hedge error is residual risk or deviation from the intended hedge, arising from basis, correlation, maturity and modelling mistakes.
Mechanism: Hedge ratio, instrument choice and dynamic adjustment determine error; partial hedges may retain views or add new risk.
Example: For example, hedging a stock with a sector ETF leaves tracking error and idiosyncratic risk.
Boundary: Hedging is not risk elimination; basis widening, correlation breaks and counterparty default cause losses, and over-hedging adds cost and liquidity risk.
risk scenarios
Definition: Risk scenarios are assumption sets for rates, growth, inflation, credit, FX or extreme events used to estimate losses and capital needs.
Mechanism: They can be historical, hypothetical or stress tests; correlation, feedback and liquidity shift under pressure, and tails must be covered.
Example: For example, a stress test combines rates up 200 basis points, home prices down 20 percent and unemployment up 5 points.
Boundary: Scenarios are not forecasts; assumptions are subjective, tails can be worse, models may understate feedback and liquidity, and incomplete coverage misses new risks.
liquidity and tail risk
Definition: Liquidity risk is the inability to sell or fund in time, and tail risk is extreme but low-probability loss.
Mechanism: Liquidity deteriorates under stress, tails raise correlation and force deleveraging, and normal models such as VaR understate tails.
Example: For example, bond fund redemptions surge in a crisis, forcing discounted sales and losses beyond normal volatility.
Boundary: Liquidity is not constant; normal depth can vanish under stress, tail models can understate due to short history, and insurance and hedges carry basis and counterparty risk.
Related
- Required prerequisite: Diversification and Common Risk (INV-017).
- Related reading: Diversification and Common Risk (INV-017), Asset Allocation and Risk Budgeting (INV-018), The Law of One Price and No-Arbitrage (FIN-014), Introduction to Asset Pricing Models (FIN-015).
Figures in plain language
The three figures below check the mechanism, boundary and comparison in this article; labels come from its own sections, not new data.
Exercises
- Calculation. How many futures contracts are needed?
- Calculation. What is the net cost if the price falls to CNY 1,700?
- Judgement. How does a basis of +CNY 50 per tonne affect the effective price?
Suggested answers
- 10 contracts.
170,000 + 30,000 = CNY 200,000before fees.- The effective price rises to about CNY 2,052 per tonne, including the CNY 50 basis and CNY 2 of fees.
Sources
- Julie Dahlquist and Rainford Knight. “Principles of Finance, 20.1 The Importance of Risk Management.” OpenStax. https://openstax.org/books/principles-finance/pages/20-1-the-importance-of-risk-management (accessed 2026-10-30)
- Julie Dahlquist and Rainford Knight. “Principles of Finance, 20.2 Commodity Price Risk.” OpenStax. https://openstax.org/books/principles-finance/pages/20-2-commodity-price-risk (accessed 2026-10-30)
- Julie Dahlquist and Rainford Knight. “Principles of Finance, 20.3 Exchange Rates and Risk.” OpenStax. https://openstax.org/books/principles-finance/pages/20-3-exchange-rates-and-risk (accessed 2026-10-30)
Worked demo
Read-through check: can you say three things?
No recitation needed. Tick each sentence below and see whether you can explain the mechanism, one worked example and one boundary in your own words.
Ticked 0 / 3
The numbers are teaching assumptions that show relationships, not forecasts or investment advice.
This article has passed the current publication gate. Factual, calculation and translation revisions update both language versions together.